PROJECTS EXECUTED

OPERATION AND MAINTENANCE

OPERATIONS & MAINTENANCE SERVICES

 

Client: CENIT ENERGY LIMITED

Period: 2012 to date

           

Operations and maintenance of a 126 MW GE 9E.03 Gas Turbine Generator power plant, including undertaking and coordinating major maintenance activities, repairs, borescopic inspection, combustion inspection and hot gas path inspection

OPM


POWER GENERATION

TEMA CENIT POWER PLANT

EPC FOR 126 MW THERMAL POWER PLANT

 

EPC Contractor for the Tema CENIT Thermal Power Plant (TCTPP) which was tested and commissioned in 2012.

TCTPP

VRA TEMA THERMAL 1 POWER PLANT

EPC FOR 126 MW THERMAL POWER PLANT

 

EPC for the 126MW Tema Thermal 1 Power Plant (TT1PP) as a full package turnkey project.  This was the first gas turbine power plant constructed by a wholly-owned Ghanaian company.

The plant consisted of 1 x 126MW GE MS9001E gas turbine generator and various Balance of Plant.

TT1PP

VRA HYDRO-ELECTRIC PLANT RETROFIT

 

Management of the Development and testing of hydro turbine runners for the

6 × 165 MW hydro turbines retrofit project in 1995

VRA HYDRO

VRIDI POWER PLANT, Cote D’Ivoire

 

Turnkey conversion of 4 × 25 MW GE F5 turbines from heavy oil to gas at the Vridi Power Plant – L’EECI, Cote d’Ivoire in 1989

VRIDI


SOLAR POWER GENERATION

ACHIMOTA
Solar Panels mounted Achimota School Assembly Hall

Achimota School Solar Power Project

 

Design, Installation and Commissioning of 80 kWp pilot Solar PV Grid Power Generation System with Net metering capabilities, with support from the Ministry of Power, Ghana

 

Client: Achimota School

 

Period: 2021

GEDAP MINI-GRID ELECTRIFICATION - 49kWp Solar PV Grid Power Generation System  MINI-GRID CONNECTED SOLAR PV HYBRID ELECTRIFICATION LOT 1

Client: Ministry of Power, Ghana

Period: 2015

 

Design, Supply, Installation, Operations and Management of a Mini-Grid Electrification Project. 

GEDAP

The installed Grid Connected power Generation system was sized up to provide Alternating Current (AC) to 150 households for basic lighting and small appliances.

 

Activities undertaken included: logistics planning, transportation of all the major equipment and materials, designing of the powerhouses, erection and installation of the solar PV, inverters, control modules, battery banks, Diesel genset, wind turbines, cabling and first run commissioning tests

GEDAP MINI-GRID ELECTRIFICATION MINI-GRID CONNECTED SOLAR PV HYBRID ELECTRIFICATION LOT 2

 

Client: Ministry of Power, Ghana

Period: 2016

 

50 kWp Solar PV Grid Power Generation System

The installed Grid Connected power Generation system was sized-up to provide Alternating Current (AC) to 152 households for basic lighting and small appliances.    

Activities Undertaken included: logistics planning, transportation of all the major equipment and materials, designing of the powerhouses, erection and installation of the solar PV, inverters, control modules, battery banks, Diesel genset, wind turbines, cabling and commissioning test of the system.

GDAP2


GAS INFRASTRUCTURE PROJECTS

INSTALLATION OF GAS TREATMENT SKID

 

Client: CENIT Energy Limited

Period: 2015 

 

Electro-mechanical erection, testing and commission of gas pipeline interconnection and Rotring gas conditioning and fuel forwarding skid for a 126 MW (GE F-9E Gas Turbine) thermal plant.

CENIT GAS

DESIGN AND CONSTRUCTION OF GAS PIPELINE

 

Client: West African Gas Pipeline

Period: 2007 

 

 

EPC for the construction of 3.5 km natural gas pipeline from West Africa Gas Pipeline Company terminal to the Tema Thermal 1 Power Plant.

WAGP

DESIGN AND CONSTRUCTION OF GAS PIPELINE

 

Client: Volta River Authority

Period: 2006

 

EPC for the construction of 1.5 km natural gas pipeline from West Africa Gas Pipeline Company terminal to the Takoradi Thermal Power Plant.

VRA GAS